#8402 - 5/03A®INSTALLATIONandMAINTENANCEMANUALQC-40PROCESSING REFRIGERATION SYSTEMW164 N9221 Water Street ●P.O. Box 450 ●Menomonee Falls, Wisconsin 53
PG. 8 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL2.5 MAIN MENUThe main menu is the starting point for allfunctions of the Quickchiller. This in
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 92.7 SHUT-DOWN PROCEDURE Stage 1:Prior to introducing product to the cabinet, theunit should be
PG. 10 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL2.0 — Controls, Operation and Start-Up2.8 HARDWARE NOTESNOTE: Refer to Operation and Procedur
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 115.1 INTRODUCTIONTo insure trouble free operation and the highest level of sanitation control,
PG. 12 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL5.5 EVAPORATOR CONDENSATE DRAINHOSE INSPECTION AND CLEANING1. Every 4-6 months, the evaporator
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 13Rack Management Trolley System10•10 Combitherm and 10•18W WarmerDESCRIPTION QUAN. PT. NO.Pan R
PG. 14 #8402 QC-40 INSTALLATION & MAINTENANCE MANUALRack Management Trolley System7•14 Combitherm and 10•18W WarmerDESCRIPTION QUAN. PT. NO.Pan Ra
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 15Rack Management Trolley System10•18 Combitherm and 10•18W WarmerDESCRIPTION QUAN. PT. NO.Pan R
PG. 16 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL3.1 — QC-40 CONTROL PARTS LIST, see page 13ITEM DESCRIPTION QUAN. PT. NO.CPU ENCLOSURE ASSEMBL
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 17ITEM:MODEL:DATE: REV: DWN BY: SCALE:MENOMONEE FALLS, WISCONSIN, U.S.A.®CPU ENCLOSURE #15034 F
Table of Contents - QC-401.0 GENERAL INFORMATION & INSTALLATION page1.1 Introduction ...11.2 Scope of the Manual ...
PG. 18 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL1-21-2RIGHT HAND FANSRIGHT HAND FANS3-43-45-65-6L1L1I/OI/OCABLECABLEA2425A2425SOLID-STATE RELA
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 193.4 — QC-40 - REFRIGERATION PARTS LISTITEM DESCRIPTION QUAN. PT. NO.1. Large Condensing Unit 1
PG. 20 #8402 QC-40 INSTALLATION & MAINTENANC4.1 INTRODUCTIONThe relays, which control the compressors, fans,solenoids, and heaters, can be individ
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 214.3 CONDENSING UNITSThe condensing units operate only when thesystem is in a cooling mode and
PG. 22 #8402 QC-40 INSTALLATION & MAINTENANCE MANUALPG. 22 #8402 QC-40 INSTALLATION & MAINTENANCE MANUALPROBLEMAlphanumeric display is blank.I
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 23Compressor does not runNo electricity...Close start or disconnect s
PG. 24 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL3-43-4RIGHT HAND FANSRIGHT HAND FANSL1L15-65-65-65-63-43-4L1L11-21-2LEFT HAND FANSLEFT HAND FA
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 254.0 — Diagnostic and Repair Procedure — ELECTRICAL
PG. 26 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL4.0 — Diagnostic and Repair Procedure — PIPING
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 27TRANSPORTATION DAMAGE and CLAIMSAll Alto-Shaamequipment is sold F.O.B.shipping point, andwhen
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 11.1 INTRODUCTIONThe Alto-Shaam® Quickchiller is a processingrefrigeration system designed to ra
PG. 2 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL36-3/4"(933mm)6"(152mm)70-1/4"(1784mm)30-3/8"(772mm)19-1/4"1"(25m
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 31.5 RECEIPT AND UNPACKINGUpon receipt of the Alto-Shaam® Quickchiller,note any crate markings f
PG. 4 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL1.6.6 ELECTRICAL: The Quickchiller must beinstalled by a qualified electrician. Thisappliance
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 52.1 START-UP PROCEDURES2.1.1 Place the branch circuit breaker (mainpanel) in the ON position.
PG. 6 #8402 QC-40 INSTALLATION & MAINTENANCE MANUAL2.0 — Control Set-Up and OperationMICROPROCESSOR CONTROLThe Alto-Shaam® Quickchiller™ includes
#8402 QC-40 INSTALLATION & MAINTENANCE MANUAL PG. 7Table 2.4.1 CONTROL MODE OVERVIEWMode Operation DescriptionAuto ChillRefrigeration is controlle
Comments to this Manuals