Alto-Shaam VAE-30F Specifications Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
DAILY CLEANING
Exterior: At least once a day, wash the exterior with
warm water, mild soap or detergent and a clean non-
abrasive cloth. Rinse with clean, warm water and dry
with a clean, non-abrasive cloth.
WEEKLY CLEANING
Remove the grease baffle, grease cup and drip pan.
Empty the grease cup and drip pan. Wash and rinse
the grease baffle, grease cup, and drip pan in the sink
or dishwasher using mild grease detergent and warm
water. Dry with a clean non-abrasive cloth.
MONTHLY CLEANING
Remove the HEPA filter and optional charcoal filter.
Cover the frypot. Wash the interior of the ventilator
with warm water, mild soap or detergent and a clean,
non-abrasive cloth. Dry thoroughly with a clean, dry
non-abrasive cloth.
Use and maintenance shall be in accordance with the
Standard for Ventilation Control and Fire Protection of
Commercial Cooking Operations, NFPA 96 (current
edition).
NOTE: A signed and dated Fryer Hood Maintenance Log
must be maintained on the premises, and shall be
available for use by the authority having
jurisdiction.
See sample in back of this manual.
THREE MONTH MAINTENANCE
Clean the entire hood plenum and blower section.
SIX MONTH MAINTENANCE
1. Inspection and testing of total operation including fire
damper and all safety interlocks shall be performed by
qualified service personnel.
2. All fire suppression system actuation components
including manual pull station and any remote manual
pull station must be inspected for proper operation in
accordance with the maintenance schedule published
in Ansul
®
R-102 System Design, Installation, Recharge
and Maintenance Manual (#418087).
3. On VAE Model fryers, open the rear cover access door
and lubricate the lift worm threads with moly
(molybdenum disulfide) grease.
ANNUAL MAINTENANCE
The fire suppression system fusible links must be
replaced. Nozzles and manual pull station must be
cleaned in accordance with Ansul
®
R-102 System
Design, Installation, Recharge and Maintenance
Manual (#418087).
TWELVE YEAR MAINTENANCE
The fire suppression agent tank and 1/4" flex hose
must be hydrostatically tested, and the fire
extinguishing agent must be replaced in accordance
with the maintenance schedule published in Ansul
®
R-102 System (Standard UL300 listed). This
maintenance to be performed by a qualified Ansul
®
service personnel only.
Operation and Care Manual #8452/53/55 7
VENTILATOR CLEANING INSTRUCTIONS
REQUIRED MAINTENANCE
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 25 26

Comments to this Manuals

No comments