Alto-shaam Food Holding Cabinet 1000-UP User Manual Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
S I T E I N S T A L L A T I O N
I N S T A L L A T I O N
500-S, 750-S, 1000-S, 1000-UP INSTALLATION/OPERATION/SERVICE MANUAL 9.
Stacking Configurations
1000-S with 1000-S, 1000-TH/III, or 1000-TH-II/Split
750-S with 750-S, 750-TH-II, 750-TH/III, 767-SK, 767-SK/III
500-S with 500-S, 500-TH-II, 500-TH/III
CASTER SET
SCREW
TOP
MOUNTING
SCREWS
STACKING
POSTS
TOP
MOUNTING
SCREWS
STACKING INSTRUCTIONS
1) If the two appliances were shipped together from the factory, the top unit will have the
casters already removed. A stacking kit will be included with the shipment.
If casters need to be removed: lay the unit on its back, and remove the set scr ew on each caster. Pull the
casters out of the unit.
2) While appliance is laid on its back, insert one stacking post in each of the four corners
of the upper unit. Secure the stacking posts using one screw and two flat washers that
come with the stacking kit.
Note: The flange on the stacking posts must face the outside of the unit.
3) Remove the four top mounting screws from the lower unit. Place the upper appliance,
which has the stacking posts installed, on top of the bottom unit. Center the top
unit from front to back. Re-install the four screws through the flange of the four
stacking posts.
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 47 48

Comments to this Manuals

No comments